Barclays Bank, Mansfield, Nottinghamshire

Barclays Bank RefurbishmentThe phased strip-out and re-modelling of a working branch of Barclays Bank, allowing the bank to remain open while the works were undertaken. The work required co-ordination with the Bank’s specialist sub-contractors to progress the refurbishment outside working hours. A high standard of finish was achieved in strict compliance with Barclays Corporate Design directive.

Contract value: £140k

Contract period: 8 weeks

Barclays Bank, Kings Heath, Birmingham

Carried out concurrently with the Mansfield branch re-modelling works, this was a similar contract involving the full strip-out and refurbishment of a high street branch while the bank remained in full operation.

Contract Value: £100k

Contract period: 6 weeks

Slater Plastikard

New build factory unit for Slater PlastikardClient Name: Slaters
Description:
New Build 7500sqft office and factory unit. Extensive site remediation and demolition.
Contract Value:
490k
Contract Period:
16 weeks

Project Team

Architect: Peter Eaton Associates
Engineer:
Peter Eaton Associates
M&E:
Belair Design
PQS/PM:
Belair design
Form of Contract:
Design and Build

Seddons

Anchor Housing Trust Refurbishment WorkClient Name: Anchor Housing Trust
Description:
The Anchor Housing Trust delivers the Decent Homes Programme:

  • Full rip out and new installation of 45 bathrooms
  • Full rip out and new installation of 50 kitchens.
  • Installation of Cavity Loft insulation for 70 residential properties for Anchor Housing in Derby, Leicester and Mablethorpe

Contract Value: 170K
Contract Period:
12 weeks

Project Team

Architect: Anchor trust
Engineer:
Anchor trust
M&E:
IKON civils
PQS/PM:
IKON civils
Form of Contract:
JCT Minor works

Milton Drive

Milton Drive New BuildClient Name: Private Client
Description:
Design and Build Contract for a private client. New build, modern contemporary 4 bedroom home.
Contract Value:
220K
Contract Period:
6 months

Project Team

Architect: McAfee design
Engineer:
Abatech UK
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

Madison Court Phase 2 - Manchester

Madison Court Tower Block RefurbishmentClient Name: Claremont Property Holdings
Description:
Complete re configuration of the ground floor for this Salford Tower block. Incorporating store rooms and communal areas, the new floor plan boasts 7 new luxury apartment.
Contract Value:
160k
Contract Period:
8 weeks

Project Team

Architect: Calder peel
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
JCT Building Contract

Mansfield Road, Nottingham

Building Project Mansfield Road NottinghamClient Name: JHS
 
Description: Design and build project for a 2 storey unit housing 2 retail units and upper storage floor. Customer car parking.
 
Contract Value: 470K
 
Contract Period: 6 months

Silver Lane

Client Name: JB Coates
 
Description: Design and Build project for Trade Counter Industrial unit in Doncaster. Steel frame  block of  industrial units with mezzanine floors and partitioning, complete with facilities and car parking.
 
Contract Value: 250 x 3
 
Contract period: 9 months

Apple Tree Dental Practice

Apple Tree Dental SurgeryClient Name: Private Client
 
Description: The original building was previously a retail unit and required a  complete strip out for the change of use. Installation and fit out of a new dental practice which included 3 treatment rooms, waiting room and amenities.
 
Contract Value: 120K
 
Contract Period: 9 weeks

River Bank - Stoke On Trent

Riverbank Office Development Stoke on TrentClient Name: Davenport Properties
Description:
6 New Build office units on a traditional business park. Units vary in size from 2500 – 10,000sqft.
Contract Value:
£1.8 million
Contract Period:
15 months

Project Team

Architect: PD Architects
Engineer:
Jasper Associates
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

 

Handover Residential Care Home - Mansfield

Handover Care Home Building RefurbishmentClient Name: Handover Care
Description:
Complete refurbishment of a 65 bedroom residential nursing home. The building was unoccupied for the property to be stripped back to the original fabric and re-constructed. 
Contract Value:
£2.2 million
Contract Period:
10 months

Project Team

Architect: PD Associates
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

The Tower House - The Park

Tower House The Park NottinghamClient Name: Trent Valley
Description:
Previously 3 garages, the site was a unsuspecting location for a unique individual build. 4 storey family home was built using locally sourced materials in keeping with The Park and its surroundings.  Sale Price £750k
Contract Value: 320k
Contract Period:
8 months

Project Team

Architect: Beckitt Jackson
Engineer:
Ward Cole
M&E:
Belair Design
PQS/PM:
Belair design
Form of Contract:
Design and Build

The Lodges

New Homes Longdale Lane RavensheadClient Name: Trent valley
Description:
An original lodge occupied this site and required demolition. In its place 2 brick built two storey lodges were constructed using local materials in keeping with The Park Estate.
Contract Value:
300k
Contract Period:
6 months

Project Team

Architect: Beckitt Jackson
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

Church Drive - Ravenshead

Church Drive RavensheadClient Name: Belair
Description:
Located in a desirable location and beautiful surroundings, we constructed 6 Luxury 4 & 5 bedroom detached homes.  The development was built in keeping with the local environment using Traditional construction and local materials. Sale price 450k – 595k 
Contract Value:
£1.3 million
Contract Period:
12 months

Project Team

Architect: Nevell Hardy Associates
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

The Elms - Nottingham

The Elms apartment development in NottinghamClient Name: Trent valley
Description:
Superb Corner plot location acquired with an existing bungalow for demolition. 3 storey brick built apartment complex with 17 individually designed apartments and car parking. Sale price from £80k - £140K
Contract Value:
£1.8 Million 
Contract Period:
14 months

Project Team

Architect: MS Architects
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

The Wedge - Nottingham

The Wedge residential block and retails units NottinghamClient Name: Belair
Description:
The Site acquired by belair was a petrol station which required full decontamination and clearing. The new build comprised of a mixed scheme of retail unit, 24 one and two bed apartments with underground car parking. 
Contract Value:
£2.6 million
Contract Period:
12 months

Project Team

Architect: Rayner Davies
Engineer:
Ward Cole
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
Design and Build

Madison Court Phase 1 - Manchester

Madison Court Tower Block Refurbishment ManchesterClient Name: Claremont Property Holdings
Description:
Major extensive refurbishment of a residential 1960’s 23 storey tower block in Salford. The project included the replacement of all windows and the refurbishment of 2 lifts. The refurbishment included the complete external leaf of the building which in turn has marked a huge improvement for the surrounding area.
Contract Value:
£3.2 million
Contract Period:
12 months

Project Team

Architect: Calder peel
Engineer:
Brealey Green
M&E:
Belair
PQS/PM:
Belair
Form of Contract:
JCT Building Contract